When the homeowner decides they will be moving forward with the stucco repair or installation, they will be scheduled into the Gilbert team’s calendar. Our team will contact the client one week before the installation or repair, and one day before to confirm. Depending on the size of the job, the team will use the first day to prepare and mask the home or building. The substrate will be repaired, meaning any cracks will be caulked and the home will be power washed or scrubbed. The stucco will then be applied using the layering and drying system, which varies in timing based on temperature, weather conditions and the size of the job. Typically, our stucco projects take anywhere from two days, for small projects, to three weeks for very large installations.